Rustic Trades built this 13-foot, bar-height live edge walnut waterfall river table for the North American headquarters of the company now known as TK Elevator.
Set high above The Battery Atlanta in Marietta, Georgia, the table was designed for a gathering space overlooking Truist Park, home of the Atlanta Braves. Its scale, black epoxy river and continuous waterfall ends called for exceptional walnut, careful engineering and a fabrication process measured in weeks rather than shortcuts.
Walnut, black epoxy and one continuous line.
Two live edge black walnut slabs form the top, separated by a restrained black epoxy river. At each end, the walnut turns downward in a waterfall, carrying the grain and river detail from the horizontal surface to the floor.
Made for a building devoted to moving people.
The table was commissioned for the campus originally announced as the thyssenkrupp Elevator Americas headquarters and now operated by TK Elevator. Its 420-foot Innovation and Qualification Center contains the tallest elevator test tower in North America and anchors a three-building campus at The Battery Atlanta.
When the complex was announced, the neighboring ballpark was called SunTrust Park. Today it is Truist Park—the home of the Atlanta Braves—and the view from the upper levels places the table inside one of metro Atlanta’s most recognizable business and sports destinations.
The project began with 20-foot walnut slabs.
A 13-foot finished table does not start with a 13-foot board. The waterfall ends had to be cut from the same slabs as the top so the grain could continue through both turns. That meant sourcing walnut approximately 20 to 21 feet long and 26 to 30 inches wide before trimming.
We found the right slabs in Oregon, where long growing seasons and wet conditions can produce unusually large black walnut. Once the pair arrived in Atlanta, we tested orientation, balanced the live edges and confirmed the final layout with the client before cutting.
Build the form first. Pour second.
The slabs are cleaned, dried and positioned inside a rigid, nonstick form. Every joint and penetration must be sealed so liquid epoxy cannot escape during the pour or cure.
Resin and hardener are measured to the manufacturer’s ratio, mixed thoroughly and pigmented black. The epoxy is poured at the depth and pace specified for the system so heat can dissipate and bubbles can be managed.
The assembly remains level and undisturbed while the epoxy hardens. For a deep pour of this scale, cure time can run roughly two to four days depending on the resin system and the temperature in the shop.
Behind the build · pouring the black epoxy river
Turning a cured pour into one level surface.
After the epoxy cured, the top was too large for an ordinary planer. A router sled traveled on parallel rails above the table, shaving down high points until the walnut and epoxy were perfectly coplanar. The surface was then sanded through progressively finer grits before receiving its protective finish.
Thirteen feet up, then all the way up.
Large custom furniture often turns installation into a second engineering project. This one came with an advantage only an elevator company could provide: a freight elevator large enough to carry the 13-foot table to its final floor.
That generous route made the delivery smoother than most projects at this scale. Once upstairs, our crew positioned the table, completed the final assembly and aligned the long river with the room and its view over The Battery.
Built around the room—and the view beyond it.
The completed piece combines the irregular beauty of live edge walnut with the discipline of a long architectural form. Its waterfall ends give the 13-foot span visual weight, while the narrow black river keeps the surface calm and continuous.
Planning a live edge table at an extraordinary scale?